January 27, 2024

What are Criteria for MUDA Plots?

MUDA Approved Plots

Mysore Urban Development Authority (MUDA) is responsible for the planned development of Mysore city. MUDA approved plots are those that meet the criteria set by the authority and are suitable for residential or commercial construction purposes.

Construction Criteria

  1. Site Area: The minimum site area for MUDA approved plots varies based on the zoning category. It is important to familiarize yourself with the specific requirements for the plot you are interested in.
  2. Building Height and Setbacks: The authority specifies the maximum permissible height for buildings and the required setbacks from the plots boundaries. Adhering to these regulations ensures proper spacing between structures and promotes a harmonious urban environment.
  3. Building Rules: MUDA plots must adhere to building rules related to floor area ratio (FAR), building coverage, open spaces, parking provisions, and the number of permissible floors. These rules prevent overcrowding and promote balanced development.
  4. Utilities: MUDA plots should have access to essential utilities such as water supply, electricity, drainage, and sewage systems. Availability of these services ensures comfortable living and smooth functioning of businesses.

Land Conversion Documents

When considering a MUDA plot, it is important to verify the land conversion documents to ensure the legality of the property. This includes:

  • Conversion Order: A valid conversion order from the competent authority is necessary to convert agricultural land into non-agricultural land for residential or commercial purposes.
  • NOC and Approvals: No Objection Certificates (NOC) from relevant departments such as the Pollution Control Board, Fire Department, and Airport Authority may be required for specific plot locations or project types.
  • Title Deed: The land should have a clear title deed, free from any disputes or encumbrances.
  • Revenue Records: Verification of revenue records, including the mutation extract and tax receipts, should be undertaken to verify the authenticity of the land and clear any outstanding dues.

Conclusion

Choosing a MUDA approved plot ensures that the property meets the necessary standards and regulations set by Mysore Urban Development Authority. Before purchasing a MUDA plot, it is essential to thoroughly review the construction criteria, land conversion documents, and other relevant factors to make an informed decision.

Be first to comment
Leave a reply